Projects

  Building of Pedestrian Overpass on PUO Zir

140,5 m pedestrian overpass construction in order to connect resting places on both sides of the highway.

The project comprises construction of a pedestrian overpass, restructuring of the resting places, building of a new public toilet and adjustment of the existing traffic areas.

Total length of pedestrian overpass is 140,5 m, width 3,2 m and has five columns at the distance of 32 m. Construction of overpass is made from steel and has four segments. Access to the overpass is provided by two staircases equipped with elevators.

The rest of the project (restructuring of resting places, building of new public toilet and adjustment of existing traffic areas) is in function for implementation existing and new solution of resting places.

Infrastructure

Building of Pedestrian Overpass on PUO Zir

  • Services rendered

    Engineering Supervision
  • Project size

    140,5m overpass
  • Project value

    700.000 €
  • Project period

    2011
  • Investor

    Croatian Highways Authority