  FIDIC Engineer Supervision

GI provided technical and financial supervision, FIDIC Engineer and Coordinator for occupational safety and health over Vodice bypass construction works according to the FIDIC Red Book.

FIDIC Engineer Supervision for Vodice bypass ring. The goal of Vodice bypass project was traffic reduction in Vodice city, especially during the summer season, thereby achieving shortening travel time, increasing traffic safety and relocating transit traffic from the centre of Vodice.

The bypass ring starts from the direction of Zadar, next to the industrial zone of Vodice, and ends in Srimska Lokva. The total length of the ring road is 5.1 kilometres including three crossroads, four overpasses, three pipe galleries, 28 parallel roads, internal and external drainage,  580 m long noise protection wall, traffic equipment and signalization, landscaping and relocation and protection of the water supply piping system and power lines. Permissible vehicle speed is 80 km/h.

Infrastructure

FIDIC Engineer Supervision

  • Services rendered

    Supervision and FIDIC Engineer
  • Project size

    Bypass road 5.1 km, 4 overpasses, 3 intersections,3 pipe galleries
  • Project value

    38.5 mil HRK
  • Project period

    2016 - 2017
  • Investor

    Hrvatske ceste d.o.o.