Infrastructure

Infrastructure

  Rehabilitation of Žutnica Tunnel

GI has performed a complete technical and financial supervision of the rehabilitation of tunnel Žutnica.

Road tunnel is in traffic since 1970, and had no drainage system. 

Žutnica tunnel has a length of 215 m¹. The existing tunnel lining, which served as the primary tunnel support, hydro insulation has been added and built a new secondary tunnel lining. Concrete used for the secondary tunnel lining was reinforced with plastic bristles. Rehabilitation of the tunnel was built with a completely new drainage system.

Infrastructure

Rehabilitation of Žutnica Tunnel

  • Services rendered

    Engineering Supervision
  • Project size

    215 m¹
  • Project value

    9,1 mil.kn
  • Project period

    2009
  • Investor

    Croatian roads